Executive project, for a capacity of 30,000 tons of waste, and construction of the sanitary landfill that includes caves waterproofed with geomembranes to dispose of the waste, leachate collection and conduction drains, pumping wells, effluent treatment plant, conduction system and rainwater evacuation, deep water monitoring wells and auxiliary services necessary for the operation.