Railroad track rehabilitation of two sections of : 133km from Piedra Sola to Algorta and 194 km from Algorta to Salto Grande.

  • Characteristics:

    • Length to rehab: 327 km.
    • Reinforcement of bridges: 46 bridges.
    • Railroad track ballast: 300,000 m2.
    • Rail UIC54E1: 562,000 m. 
    • Sleepers: 400,000.