Teyma

Fishing Port

Fishing boat pier

  • Area: Civil and architecture.

  • Client: National Administration of Ports.

  • Place: Montevideo.

  • Status: Ongoing.

Engineering and construction of a 1.000 m pier founded over piles, dredging and backfill works, for a minimum mooring capacity of 50 fishing boat.

Characteristics:

  • Pier (over piles) length: 700 m
  • Wharf (cofferdams) length: 300 m
  • Concrete piles: 300 units
  • Dredging: 1.000.000 m3
  • Backfill: 450.000 m3
  • Precast concrete: 4.500 m3
  • In-situ concrete: 25.000 m3
  • Pavements: 25.000 m
  • Geotubes: 650.000 m3

Back to Projects