Melo Converter Station

Melo Converter Station

  • Area: Eléctrica.

  • Client: Areva T&D.

  • Place: Melo. Cerro Largo.

  • Status: Concluded.

Engineering and contruction of all associated civil works, assembly of equipment  provided by Areva, on-site trials and start-up of  a 500 kW frequency converter station.

  • Characteristics:

    • Buildings: 3,000 m2.
    • Reinforced concrete: 14.000 m3.
    • Concrete pavement: 20,000 m2.
    • Soil movement: 300,000 m3.
    • Equipment assembly: 900 tons.
    • LV and MV wire laying: 292,500 m
    • HV overhead line: 23 km.
    • Transformers and reactors: 20 units.