Motors - Central Batlle

“José Batlle y Ordoñez” power plant

  • Area: Industrial.

  • Client: UTE.

  • Place: Montevideo.

  • Status: Concluded.

Installation of 8  motor-generator sets of 1.5 MW each, two transformers of 11/150 kV and construction of ancillary facilities (O&M workshop, control building and a 120 radiator park).

  • Characteristics:

    • Buildings: 4,000 m2.
    • Metallic structure: 700 tons.
    • Equipment assembly: 2,250 tons.
    • Soil movement: 6,000 m3.
    • Installed power: 84 MW.